Project Introduction This project is national dam-break simulation experiment, for getting the simulation result of deformation and force situation when the simulative dam breaking after the impound water over load. With this opportunity, we installed 5 meters ADM (0.5m/segment) in 2 boreholes of the dam body (every borehole is 5 meters in depth), to verify the timeliness and accuracy of collected data by ADM.