Excavation Dewatering in PLAXIS: An Iterative Approach to Find Pore Pressure Equilibrium for Better Stability begins on Aug 6th 2026
St. Francis Dam: Worst Civil Engineering Failure of the 20th Century
Web Class Project Assignment Dam Engineering Concrete / Rollercrete Dams Engineering Geology Forensics Groundwater & Seepage Rock Mass Characterization

Assignment prepared by JAnna Valdez in the fall 2020 semester of the CE 179 upper-level graduate Geosystems Design course in the Department of Civil and Environmental Engineering of the University of California at Berkeley.