Excavation Dewatering in PLAXIS: An Iterative Approach to Find Pore Pressure Equilibrium for Better Stability begins on Aug 6th 2026
Inside the Waller Creek Tunnel
News Tunneling

Austin media were invited into the under-construction Waller Creek Tunnel in downtown Austin this spring. Videographer Jeff Heimsath captured these scenes.